Multi-Site IT Deployment Services
Multi-location IT deployment services exist because rolling out technology to 200 sites is not 200 small projects. It is one large system with 200 points of failure. IMI Solutions has run that system across Australia and New Zealand since 1999, delivering identical, positive outcomes at every location for clients such as Coles, NAB, IBM and Luxottica.
The multi-site problem
Deploy to one office and your best engineer covers everything. Deploy to 200 branches and you need:
- 200 accurate site records before anyone books travel
- Devices staged and kitted per site, arriving in step with the crew
- A written method every engineer follows the same way
- Live visibility of which sites are done, blocked or drifting
- An exception process that fixes site 47 without stalling sites 48 through 60
Miss any of these and outcomes vary site by site. Variance is the enemy: it produces revisits, support noise and stores that quietly run on workarounds for years.
What IMI delivers
Parallel rollouts. Multiple crews run concurrent waves across states and both countries, compressing timelines without crowding any single region's resources.
Identical outcomes. One playbook, one staging standard, one sign-off checklist. The site in Dubbo passes the same test as the site in Chatswood.
Protected BAU. We manage the deployment lifecycle end to end, planning, logistics, staging, installation and validation, while your IT team stays on business as usual. Field engineers are backed by our own technical desk, so exceptions get resolved without pulling your staff in.
Full visibility. Every asset is tracked serial-by-serial in IMX from receipt to installation. You watch progress on a live dashboard instead of chasing spreadsheets.
How it works
- Audit. We survey every site and turn findings into Location Work Packages.
- Design. Waves, timelines, resourcing and governance are agreed before delivery starts. More on solution design.
- Stage. Devices are imaged, configured and kitted at our Sydney and Melbourne integration centres.
- Deploy. Certified engineers install and validate to the playbook, wave by wave.
- Close. Documentation, warranty transfer and old-asset removal complete each site, with support available beyond go-live.
Proof at scale
- 673 Reddy Express stores, POS rollout, finished 3 weeks early
- 600 Luxottica stores, POS implementation and support Australia-wide
- 2,000 POS lanes upgraded across 560 QSR stores
- 111 Team Global Express sites audited and refreshed nationally
Frequently asked questions
What site counts do you handle? Programs from 10 sites to 1,000+. The methodology scales; the governance stays the same.
Can different site types run in one program? Yes. Stores, branches, clinics and offices each get their own playbook under one project structure.
How do you keep outcomes identical? Staging removes device variance, playbooks remove method variance, and central sign-off removes judgement variance.
Do you work alongside internal IT? Constantly. Most programs run with client IT owning scope and IMI owning delivery.
Get identical outcomes at every location. Speak to an expert.